RaisePlan + CapTable Lab bundle · $29 one-time · synthetic example data

Product preview

How the workbook works

Five sheets, one rule set. Amber cells are yours to edit; formulas are locked so the maths stays intact.

Five steps

  1. Start

    Enter cash already received, model start month, an optional target signing date and your warning buffer.

  2. Runway

    Set revenue, growth, costs and hires for Base, Lean and Delayed close. Optionally type a hypothetical raise amount and the month you assume it arrives.

  3. Pipeline

    Up to 50 investor rows: stage, cheque size, next step and date. Signed amounts and cash received are tracked separately.

  4. Readiness

    Mark checklist items Done, Not done or N/A.

  5. Dashboard

    Read zero-cash months, timing checks, pipeline totals, follow-up flags and two charts.

The dashboard

Illustrative sample, synthetic data. Rendered from the v0.3 prototype in LibreOffice. Open full-size image (PNG).

Text summary: zero-cash month excluding any hypothetical raise is month 6 for Base (Apr 2027), 10 for Lean (Aug 2027) and 6 for Delayed close. Buffer check: Base warns that the receipt is fewer than 3 months before zero cash, Lean is OK, Delayed close warns that cash reaches zero first. Pipeline sample: $250,000 signed, $100,000 received, $150,000 not yet received; 2 overdue follow-ups, 2 missing dates; checklist completion 50%.

The pipeline

Illustrative sample. Investors and partners are fictional. Open full-size image (PNG).

Text summary: ten fictional investor rows with stage, cheque size, next step and date. Follow-up statuses shown: 2 Overdue, 2 Due soon, 2 Missing date, 2 Scheduled, 2 Stage closed.

Rules the workbook follows

RuleWhy it matters
Pipeline amounts never enter cash or runwayInterest, and even a signature, is not money in the bank
A hypothetical raise counts only in the month you typeIt is your scenario, not a forecast
Zero-cash month = first month ending at or below $0One literal timing convention throughout
Probabilities are optional, with no defaultsSigned and passed rows are excluded from the open weighted sum to avoid double counting
Readiness % is checklist completionIt is not a likelihood of funding

Get the bundle

The screenshots above use synthetic example data.